Saved the site in 4 days.

Project details

The job consisted of shoring on property lines for an infill, adjacent million dollar homes within 4 feet of the property line. Shoring had to be installed the entire length of the alley way. Excavation was 12 feet deep and the soil was very sandy and silty. (very conducive to our product)

  • 4 days to install
  • no vibration or pounding that could have jeopardized neighbouring property foundations